The Restoration Roadmap

Securing Wyuna's Future: A Phased Engineering Plan

Our meticulous plan details every step required to transform Australia's last 1953 diesel-electric pilot cutter into a living maritime museum.

Our Method

A Meticulous Approach to Maritime Stewardship

01
02
03
04

Hull Sealing & Integrity

Engine Preservation

Interior Timber Repair

Museum Fitting

Comprehensive ultrasonic testing and steel plate replacement to ensure the vessel's foundational strength.

Restoration of the English Electric engine room's auxiliary systems and critical electrical distribution.

Careful repair and restoration of historical timber elements to their original 1950s specifications.

Installation of interpretive displays and educational hubs to welcome the public as a floating museum.

Immediate Needs

Urgent Focus: Phase 1 Hull Integrity

Steel Plate Procurement

Underwater Hull Cleaning

Funding is critically needed for the specialized marine-grade steel plates essential for hull repairs.

Support the vital drydock work to clean and prepare the hull for inspection and welding.

Invest in a Legacy

Your contribution directly funds critical repairs, preserving Australia's maritime heritage for generations.